Bespoke staircases in Nelson
Bespoke timber staircases set out from a site survey, manufactured in our workshop and installed by our own fitters. Covering Nelson and the wider Lancashire area.
- Made to size from a measured survey, never cut down from stock
- FSC-certified timber with chain-of-custody paperwork
- Fixed written quotation with the lead time stated
- 10-year workmanship guarantee in writing
Free measured survey · No obligation · Reply within one working day
Quote for Nelson
Free measured survey in Nelson.
Bespoke staircases in Nelson
Bespoke Staircases in Nelson rewards patience at the setting-out stage. Given the cotton-town terraces, Pennine stone cottages and Fylde coast resort stock that dominates locally, standard sizes are the exception not the rule. The exposure here is high rainfall inland and severe wind exposure on the Fylde coast, which is exactly the condition that causes wind-driven rain penetration at meeting rails and sill joints. Our focus on this is setting out so the rise and going work on the day, not just on paper.
Nothing is ordered until someone has stood in front of the opening with a tape. Rough dimensions and a couple of photographs are enough for us to price it properly.
One thing that catches people out here: coastal Fylde stock needs the same specification discipline as the South West.
What we cover locally
- Bespoke Staircases in Nelson
- Cut String Staircases in Nelson
- Open Riser Staircases in Nelson
- Cantilever Staircases in Nelson
Survey visits in Nelson are usually booked within a week. There is no charge for the survey and no obligation to proceed.
Made to size for Nelson
Every item below is manufactured to your dimensions.
Bespoke Staircases
Designed and set out from your actual floor-to-floor height.
Learn more →Cut String Staircases
Open-sided stairs with the treads exposed at the string.
Learn more →Open Riser Staircases
Contemporary open-tread stairs meeting Part K.
Learn more →Cantilever Staircases
Floating treads with concealed structural support.
Learn more →Staircase Renovation
Re-treading, re-balustrading and squeak elimination.
Learn more →Handrails and Balustrades
Continuous handrails, volutes, spindles and newel posts.
Learn more →Loft Conversion Stairs
Space-saving flights for tight loft openings.
Learn more →Staircase Parts
Newels, spindles, strings and treads supplied loose.
Learn more →Rise, going and headroom in Nelson
Three numbers decide whether a staircase is comfortable or awkward, and they are the first things we measure.
Rise
Maximum 220mm per step for a private stair under Part K. Consistent to within 5mm across the whole flight, because the foot notices what the eye does not.
Going
Minimum 220mm. Rise and going together must satisfy the pitch rule, which is why a flight cannot simply be shortened to fit a smaller opening.
Headroom
2m measured vertically from the pitch line. This is the constraint that most often forces a winder instead of a straight flight.
What clients tell us
Feedback collected directly from completed projects. Full written references are available on request before you commit.
“The headroom was tight and they redesigned the winder rather than telling us it could not be done.”
Verified client, Lancashire“Dry-assembled in the workshop first, so installation day was genuinely uneventful.”
Verified client, Lancashire“No squeaks at all a year on, which was the whole reason we replaced the old one.”
Verified client, LancashireNelson questions
What guarantee do you provide?
Ten years on workmanship, covering manufacture and the factory-applied finish. Where we install, the installation is covered too. It is issued in writing with the handover paperwork.
What if the opening is out of square?
Most older openings are. The survey records the actual dimensions at several points and the unit is manufactured to suit, which is the main reason we survey rather than work from the sizes given over the phone.
Do you take a deposit?
Not before the measured survey. A deposit is only requested once the survey is complete and you have approved the final schedule and price.
How long does a typical order take?
Most made-to-size orders run six to ten weeks from survey to delivery. Conservation and heavily detailed work can take longer, and we confirm the lead time in writing at quotation rather than leaving it open.
Can you work on a listed building?
Yes, and a significant share of our work is listed or conservation area. We can supply drawings and section details to support a listed building consent or planning application, though the consent itself remains the owner's responsibility.
Talk to us about your project
Free, no obligation, and a fixed figure in writing. We will tell you honestly if what you are asking for is not the right answer.
Request a quote Call 0800 088 6248